Oil, gas and chemical companies often buy technology before deciding what it should fix. IT strategy consulting settles that first, so the next spend solves a real problem.
TL;DR — Key Takeaways
- Stalled digital programs usually fail on direction, ownership and measurement, not on the software itself.
- Name one operating problem and one number to move before choosing any platform.
- Settle who owns plant data, and how it reaches IT systems, before adding analytics or AI.
- Treat OT security and integration readiness as entry requirements, not later phases.
- Fund in stages, tie each stage to a measured result, and write down when you will stop.
Why the last technology investment often under-delivered
Many oil, gas and chemical companies have a pilot that worked well on one asset and never spread to the next. The software usually did what it promised, so the cause sits somewhere else.
A Deloitte survey of operations, digital and IT leaders found six obstacles. They included defining and tracking digital value, IT and OT convergence, and execution.
Look at that list again. Almost every item is a question of direction, ownership or measurement, and software cannot answer those for you.
Whether it is an upstream field, a gas plant or a chemical site, the pattern repeats. The tool arrives first, and the decisions follow later, after the money is spent.
Fixing that order is the real purpose of IT strategy consulting. It is far cheaper to settle these decisions before a contract is signed than after the first release is live.
What IT strategy consulting covers
IT strategy consulting is the work of deciding which technology to invest in, in what order, and how you will know it worked. It covers architecture choices, build-versus-buy decisions, sequencing, and who runs each system afterward.
Digital transformation consulting is the wider label. It adds the people side, such as operating model changes and training, so that new systems are actually used on the plant floor and in the control room.
It should not be a vendor beauty contest, and it should not end as a long slide deck. A useful result is a ranked list of investments, a named owner for each, and a measure that shows within a year whether it paid off.
Oil, gas and chemical operations add one more constraint. Plants run continuously and changes carry safety and production risk, so a strategy that ignores shutdown windows and management-of-change rules will not survive contact with operations.
Five changes to make before the next investment
None of these changes needs new technology. Most can be started with people you already have, and together they decide whether the next investment scales or stalls.
1. Start with an operating problem, not a platform
Most requests begin with a product name: a digital twin, an AI platform, a new historian. Start instead with a plain sentence, such as "unplanned compressor downtime costs us more than we can explain."
Then attach a number. Hours of downtime, cost per barrel, flaring events or batch rework are all measurable, and the investment is judged against that figure.
Involve the people who run the asset when you write the sentence. A reliability engineer or a shift supervisor can usually name the problem faster than a room full of managers, and their wording keeps the project grounded.
Here is a hypothetical example, not a client case. A mid-size chemical producer wants to buy a predictive maintenance platform, but when the team writes the problem down, they find most downtime comes from two pump types that have no vibration sensors.
The first spend becomes sensors and data capture rather than software. Writing the problem down changed what the company bought first.
2. Decide who owns operational data
IT handles business systems such as finance and procurement. OT is the hardware and software that monitors and controls equipment and processes, and the two have different owners, rules and update cycles.
Most digital use cases depend on a steady flow of operational data. McKinsey has noted that most oil and gas companies leave OT data with the asset operating teams, with few policies or tools for sharing it across the enterprise.
Before buying analytics, answer four plain questions:
- Who owns each data source, and who approves access to it?
- Where does the data live, and how long is it kept?
- What is the agreed definition of figures such as uptime or yield?
- Who corrects the data when it is wrong?
The third question matters more than it looks. If maintenance and finance calculate availability differently, no dashboard will settle the argument.
At Hubops, we treat data ownership and architecture choices as part of IT strategy consulting, alongside build-versus-buy analysis and investment prioritization.
3. Treat OT security as an entry requirement
Connecting plant systems to business networks creates new routes for an attacker. That is why security cannot be a phase that begins after the pilot.
The ISA/IEC 62443 series is the usual reference for this work. It sets security requirements for industrial automation and control systems.
It also divides responsibility among asset owners, system integrators and product suppliers, so each party knows what it must deliver.
It also asks you to split a plant network into zones and connect them through controlled conduits. Ask every vendor how their product fits that model before it is shortlisted, not after it is installed.
Patching shows why this matters. An office laptop can be updated overnight, while a controller on a running unit may wait months for a planned shutdown, so the security plan has to reflect how the plant actually operates.
A simple rule helps: if a proposal cannot show where it sits in your network zones, it is not ready for a budget line.
4. Check integration and application readiness
A new platform is only as useful as the systems that feed it. If maintenance records sit in one system, process data in another, and spreadsheets fill the gaps, a new analytics layer will inherit every one of those gaps.
Before committing, take stock of how your systems exchange data today. A short integration maturity assessment shows where interfaces are manual, undocumented or fragile.
Do the same for the applications themselves. Some older systems are worth keeping and wrapping with interfaces, while others are cheaper to replace, and that choice belongs in the strategy rather than in a project plan written afterward.
5. Fund in stages and agree the exit
Large, single-approval programs hide problems for too long. Fund in stages instead, with a clear result expected at the end of each one.
Write the stop conditions down at the start. For example, if the pilot does not move the agreed number on one asset within the agreed time, the next stage does not begin.
Budgets in this industry also move with commodity cycles. Staged funding protects the work that matters most when money tightens, because each stage already has a case behind it.
Finally, name one business owner for each stage, not only an IT owner. Results hold when the person responsible for the plant or process also owns the outcome.
What a good strategy leaves you with
By the end of the strategy work, you should be able to hold a short set of documents and answer plain questions from them. These are the items worth asking for:
- A ranked list of investments, each tied to one operating measure.
- An owner on the business side and the technology side for every item.
- A target architecture showing how IT, OT and cloud systems will connect.
- A security approach mapped to your network zones.
- A staged funding plan with stop conditions.
- A short list of what you will not do this year, and why.
That last item is underrated. Saying no to three good ideas is what gives the fourth one enough budget and attention to finish.
A practical first 90 days
Strategy work does not need a year of workshops. A focused first quarter is enough to produce a plan your leadership can approve and your plant teams can believe.
- Weeks 1 to 3: interview plant managers, reliability engineers, control engineers and IT leads, and list the operating problems they raise most often.
- Weeks 4 to 6: rank those problems by cost and by how much usable data already exists, then pick two or three candidates.
- Weeks 7 to 9: map the systems, data flows and network zones each candidate depends on, and note every gap.
- Weeks 10 to 12: draft the staged funding plan, with owners, measures and stop conditions, and review it with operations before finance sees it.
Notice that vendors enter late. By the time they are invited, the problem, the data and the security needs are already written down, so their proposals can be compared fairly.
The review in the last step is not a formality. Plant teams spot unrealistic shutdown windows and staffing assumptions quickly, and a plan they helped correct is far more likely to be followed.
Questions to ask before approving any proposal
Put these questions to every vendor, internal team and adviser. Clear answers to most of them are a good sign.
- Which operating number will this move, and by how much?
- Who owns the data it depends on?
- Where does it sit in our network security zones?
- What must already work for this to function, and does it?
- What happens if we stop after the first stage?
If three or more of these have no clear answer, the proposal needs more work before it needs money.
Mistakes that keep repeating
These show up often enough to be worth naming:
- Choosing the vendor first and writing the business case afterward, which turns the case into a justification.
- Treating a pilot on one asset as proof the approach will scale, when other sites have different systems and staffing.
- Leaving operations staff out of the design until training begins, by which point the workflow is already fixed.
- Measuring activity, such as dashboards built, instead of results, such as downtime reduced.
Final Thoughts
The next technology investment will be judged on the decisions made before it, not on how modern the platform is. Name the problem, settle data ownership, build security in, check your integrations, and fund in stages.
If you would like a second opinion before committing budget, our team is happy to talk it through.
Frequently Asked Questions
What does IT strategy consulting involve for an oil, gas or chemical company?
It sets the direction for technology spending: which problems to solve first, which systems to keep, replace or connect, and how IT and OT will share data safely. The output is a sequenced plan with owners, security requirements and measures, not just a recommendation.
How is IT strategy consulting different from digital transformation consulting?
IT strategy consulting focuses on technology decisions such as architecture, platforms and the order of investment. Digital transformation consulting is wider and adds operating model, process change and adoption. Most large programs need both.
What is IT/OT convergence, and why does it matter for strategy?
IT covers business systems, while OT is the hardware and software that controls equipment and processes. Bringing their data together supports uses such as predictive maintenance, but it raises security questions. Strategy settles ownership, access and protection first.
When is the right time to bring in a consultant?
Ideally before a major purchase or program approval, while the options are still open. It also helps when pilots have stalled and nobody agrees why. After a contract is signed, far fewer decisions remain to be made.
Which security standard applies to industrial control systems?
The ISA/IEC 62443 series is the main international reference for industrial control systems. The IEC designated it a horizontal standard in 2021, so it applies across industries. Regulators, insurers or customers may require other controls too, so check those alongside it.